Maintain Project (Acc): Difference between revisions

From eStream Software
Line 51: Line 51:
<br />
<br />
:3 Steps to setup the Project Range Editor.
:3 Steps to setup the Project Range Editor.
::[[File:Maintain Project-RangeEditor1.jpg |800px]]
::[[File:Maintain Project-RangeEditor1.jpg |1200px]]
<br />
<br />
:Balance Sheet and Profit & Loss Statement comparison project by sub-project.
:Balance Sheet and Profit & Loss Statement comparison project by sub-project.
::[[File:Maintain Project-RangeEditor2.jpg |800px]]
::[[File:Maintain Project-RangeEditor2.jpg |1000px]]

Revision as of 09:19, 1 July 2020

Menu: Tools | Maintain Project...

Introduction

1. Project can be use as Project Site or Departmental or Branches.
2. It is commonly use to apply the reports by Project.
3. It also very useful to get results from the project comparison of Balance Sheet and Profit & Loss statement.
Maintain Project-Browse.jpg


Maintain Project

Screenshot below is the Project entry form.
Maintain Project-EntryForm.jpg
Field Name Explanation & Properties
Code
  • Input the new Project code
  • Field type : Alphanumerical
  • Length : 20
Description
  • Input the Project Name.
  • Field type : Alphanumerical
  • Length : 80
Description 2
  • Input the Alternate Project Name.
  • Field type : Alphanumerical
  • Length : 80
Project Value
  • Input the estimated Project Value.
  • Field type : Numeric
Project Cost
  • Input the estimated Project Cost.
  • Field type : Numeric
Active
  • Checked = Active
  • Unchecked = Inactive


Show Range Editor

It is a multiple sub-project settings.
Right click on the right panel (below Detail button).
Maintain Project-RangeEditor0.jpg


3 Steps to setup the Project Range Editor.
Maintain Project-RangeEditor1.jpg


Balance Sheet and Profit & Loss Statement comparison project by sub-project.
Maintain Project-RangeEditor2.jpg