(One intermediate revision by the same user not shown) | |||
Line 46: | Line 46: | ||
==Show Range Editor== | ==Show Range Editor== | ||
:It is a multiple sub-project settings. | :1. It is a multiple sub-project settings. | ||
:Right click on the right panel (below Detail button). | :2. Right click on the right panel (below Detail button). | ||
::[[File:Maintain Project-RangeEditor0.jpg |600px]] | ::[[File:Maintain Project-RangeEditor0.jpg |600px]] | ||
<br /> | <br /> | ||
:3 | :3. Quick 3 steps to setup the Project Range Editor. | ||
::[[File:Maintain Project-RangeEditor1.jpg | | ::[[File:Maintain Project-RangeEditor1.jpg |1200px]] | ||
<br /> | <br /> | ||
:Balance Sheet and Profit & Loss Statement comparison project by sub-project. | :Balance Sheet and Profit & Loss Statement comparison project by sub-project. | ||
::[[File:Maintain Project-RangeEditor2.jpg | | ::[[File:Maintain Project-RangeEditor2.jpg |1000px]] |
Latest revision as of 09:19, 1 July 2020
Menu: Tools | Maintain Project...
Introduction
- 1. Project can be use as Project Site or Departmental or Branches.
- 2. It is commonly use to apply the reports by Project.
- 3. It also very useful to get results from the project comparison of Balance Sheet and Profit & Loss statement.
Maintain Project
Field Name Explanation & Properties Code - Input the new Project code
- Field type : Alphanumerical
- Length : 20
Description - Input the Project Name.
- Field type : Alphanumerical
- Length : 80
Description 2 - Input the Alternate Project Name.
- Field type : Alphanumerical
- Length : 80
Project Value - Input the estimated Project Value.
- Field type : Numeric
Project Cost - Input the estimated Project Cost.
- Field type : Numeric
Active - Checked = Active
- Unchecked = Inactive
Show Range Editor